tenowo hp tenowo1 tenowo2 tenowo3
Owner: Tenowo Hai Phong Co.,ltd Land area: 18.315 m2 Construction area: 10.656 m2 Number of floor: 1 floor factory Construction period: Feb.2024 to Aug.2024 Location: DinhVu IP, Hai Phong City