Owner:
Construction area: 30,000m2
Number of floor: 1 floor Factory; 2 floor Office
Construction period: Dec. 2007 to June. 2008
Location:
Owner:
Construction area: 30,000m2
Number of floor: 1 floor Factory; 2 floor Office
Construction period: Dec. 2007 to June. 2008
Location: